By continuing to use the site, you agree to the use of cookies. You can find out more by following this link.  OK  Find out more

 
Latest Aviation News Space NASA TESTS LAUNCH-ABORT SYSTEM FOR MOON-MISSION CAPSULE

NASA tests launch-abort system for moon-mission capsule

AFP
04/07/2019 | 365 words

NASA carried out a successful test Tuesday of a launch-abort system for the Orion capsule designed to take US astronauts to the Moon.

The three-minute exercise at Cape Canaveral in Florida aimed to test in almost real-life conditions the evacuation of astronauts from the capsule in the event of an explosion or rocket booster failure.

The test "put us one huge step closer to the first Artemis flight carrying people to the Moon," said Orion program manager Mark Kirasich.

The technique used is the US equivalent of an emergency system used last October to bring a Russian cosmonaut and a US astronaut safely back to earth when a problem emerged with their Soyuz rocket shortly after liftoff from Kazakhstan.

In the test, which was carried live on NASA TV, an unmanned Orion capsule was launched by a mini-rocket -- a repurposed first stage of an intercontinental ballistic missile.

Fifty-five seconds after the launch, at an altitude of 31,000 feet (9,500 meters), a rocket-powered tower on top of the crew module ignited its engines to quickly pull the Orion away from a hypothetical rocket experiencing problems.

In just 15 seconds, the capsule gained two miles of altitude.

Then the tower reoriented the capsule to prepare it for descent and disengagement from the tower.

In real-life conditions, parachutes would open to ease the manned capsule's fall toward the Atlantic Ocean.

In this exercise, however, parachutes were not used because they are very expensive and have already been tested multiple times.

The capsule fell into the water and -- after ejecting its black box recorders -- was allowed to sink.

A return of US astronauts to the Moon is expected in 2024 at the earliest.

Work on the Orion seems to be on schedule but the rocket that would take it into space, the so-called SLS developed for NASA mainly by Boeing, is running late.

The first unmanned test flights for the new lunar program are theoretically scheduled for June 2020 but are likely to be pushed back.

 
 
 
 
Related articles

SpaceX in 'perfect' test of Crew Dragon emergency abort system

Fifty years after Moon mission, Apollo astronauts meet at historic launchpad

New crew blasts off for ISS

Trump tells NASA to send Americans to Moon

20/01 SpaceX in 'perfect' test of Crew Dragon emergency abort system
16/01 Safran Landing Systems wins a new MRO contract for easyJet's A320 family fleet
16/01 Airbus A350: first Trent XWB engine serviced and delivered back by N3
16/01 LATAM group also to use Donecle's drones for its cell inspections
16/01 Delta TechOps seeks to double its turnover within five years
16/01 SAS Scandinavian Airlines Airbus A320neo fleet to be fully maintained by Magnetic MRO
13 JAN 2020
GAMECO Qingyuan Branch completed the first in-house overhaul of a 777-200 landing gear set. It was delivered back to CHINA SOUTHERN AIRLINES. The Guangzhou-based airline operates a total of 27 Boeing 777 aircraft and the expected landing gear overhaul business volume for GAMECO is important. The stand-alone landing gear maintenance center of GAMECO obtained the CAAC and FAA license for this type of landing gear last year.
10 JAN 2020
DASSAULT AVIATION will hold seven Falcon Maintenance & Operations (M&O) seminars in April and May in France, the United States, Mexico and Brazil, and a further one in China in October. In addition to the traditional technical briefings and the presentation of Dassault's latest products and services, Jean Kayanakis, Senior Vice President, Worldwide Customer Service and Service Center Network, will provide an update on the expansion of the service center network with TAG Maintenance Services and ExecuJet MRO Services.
12 DEC 2019
PRATT & WHITNEY CANADA and INDύSTRIA DE AVIACAO E SERVICOS (IAS) opened an overhaul centre in Belo Horizonte, which will specialize in the maintenance of the PT6A and PW200 engines, the manufacturer's designated maintenance facilities (DMFs) in the country, all integrated within two years to meet the rapidly growing Brazilian demand for these two engine families (1,300 equipped aircraft).
09 DEC 2019
SR TECHNICS announced an extension of its partnership with GMF AEROASIA covering component services for Garuda Indonesia's fleet of Airbus A330NEO and A330ceo aircraft. This Integrated Component Services (ICS) contract, effective since November 1, will be provided by the SR TECHNICS Center of Excellence for component maintenance in Kuala Lumpur (Malaysia).
09 DEC 2019
PRATT & WHITNEY announced a USD 30 million investment in its engine services facility in Bridgeport, West Virginia for the maintenance, repair and overhaul (MRO) of PW800 engines. Specifically, the site will service the market leading PW814GA and PW815GA engines that power the Gulfstream G500 and G600 aircraft, respectively, with the capacity to expand its capabilities to other PW800 engine models in the future.
ALERTAVIA, the News platform for Aerospace and Defense industry Professionals.

Featured Content
AFI KLM E&M steps up a gear on CFM's LEAP
Sabena technics finally gets back on-board C-130Hs
Airbus and Thai Airways to launch a new joint venture MRO facility at U-Tapao
How Thai Airways will Expand Rolls-Royce's Trent Engine Service Network
China embarks on board aircraft recycling
 
LATEST NEWS   CIVIL AEROSPACE   MRO & SUPPORT   AIR TRANSPORT   DEFENCE   SPACE
Follow us
© 2020 Le Journal de l'Aviation - All rights reserved