Search archive          Sign up for our Newsletters          Aviation Jobs
Latest Aviation News  |  Industry & Technology  |  Air Transport  |  MRO & Support  |  Aircraft Interiors  |  Editorials  |  Events Calendar  |  About UsFR
 
Aviation News Airbus sticking to delivery targets despite engine delays

Airbus sticking to delivery targets despite engine delays

AFP
02 JUL 2018 | 357 words

Airbus said Monday it is sticking to its target of 800 aircraft deliveries this year, despite problems with getting timely delivery of new fuel-efficient engines for its A320neo jets.

"We're sticking to our target of delivering 800 jets this year," a spokesman for the European plane maker told AFP.

According to a report by Bloomberg on Monday, setbacks with the supply of engines by Pratt & Whitney, which are being fitted into nearly half of the medium-haul A320neo jets, could jeopardise Airbus's overall annual delivery target.

The report sent Airbus shares into a tailspin on the Paris stock exchange on Monday, where they fell nearly three percent at the opening.

At around 1100 GMT, they were showing a loss of around 2.1 percent at 98.09 euros, while the overall market was down by 1.1 percent.

Problems with the engines of both the Pratt & Whitney and those jointly developed by Safran and General Electric have led to delays in the delivery of A320neo jets to clients.

Airbus had said in April that its ability to meet its delivery targets this year would depend on the engine makers meeting their deadlines.

But engine delivery has been consistently late for two years.

Nonetheless, in 2017, Airbus delivered a record 718 planes, exceeding the target of 700.

The jet maker had also exceeded its objective in 2016, with 688 planes delivered to clients.

Airbus is now aiming even higher, as it seeks to increase the production rate of its A320neo in order to meet demand.

"I say from a commercial point of view, from a demand point of view, we absolutely see a strong basis to support a rate even going higher," CEO Tom Enders said in April.

He also said Airbus expected to deliver 800 aircraft this year, even as he conceded: "It is not going to be a walk in the park".

The plane maker currently aims to produce 63 A320neo jets a month from now through to the second half of 2019.

 
Top stories
20 MAY 2021
ST Engineering and Temasek to launch narrow-body freighter aircraft leasing JV in Singapore ST Engineering and Temasek to launch narrow-body freighter aircraft leasing JV in Singapore
Singapore Technologies Engineering (ST Engineering) and Singapore investment fund Temasek announce their intention to create a 50-50 joint venture dedicated to the leasing of cargo ... Continue Reading
08 APR 2021
The Boeing 737 MAX 200 is cleared to take off in Europe The Boeing 737 MAX 200 is cleared to take off in Europe
The European Aviation Safety Agency (EASA) has in turn validated the modifications to the type certificate of the Boeing 737 MAX 8 in its 737-8200 ... Continue Reading
28 JAN 2021
Boeing reports $11.9 bn annual loss after hit on 777X delay Boeing reports $11.9 bn annual loss after hit on 777X delay
Boeing closed the books on a bruising 2020 by announcing another unpleasant surprise on Wednesday: a $6.5 billion hit from delays to its new ... Continue Reading
09 DEC 2021
The world's first Airbus A320 freighter takes off
09 DEC 2021
NYCO signs a major strategic agreement with Air France to develop sustainable aircraft lubricants
09 DEC 2021
New long-term agreement between Safran and SIAEC on CFM International's LEAP engines
09 DEC 2021
Boeing to add two 737-800BCF conversion lines at STAECO's facility in China
09 DEC 2021
Sabena Aerospace to take over several maintenance activities from Lufthansa Technik
Top stories
 
Latest News     Industry & Technology     Air Transport     MRO & Support     Aircraft Interiors     Editorials
© 2024 Le Journal de l'Aviation - All rights reserved